版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
Numericalinvestigationonthermalperformanceofgroundheatexchangersusingphasechangematerials
asgroutforgroundsource
heatpumpsystem匯報(bào)人:張恒1.Introduction2.Methods3.Resultsanddiscussion4.Conclusions1.IntroductionThereisnodoubtthattheenergyshortagehasbecomeahugeproblem,bothlocallyandglobally.Groundsourceheatpumpsystemisoneofeffectiveandefficientwaytotackletheproblem.Theverticalboreholegroundheatexchanger(GHE)iswidelyutilizedinChina.GSHPsystemsneedalargeamountoflandarea,however,Chinesepracticalsituationsisalargepopulationwithrelativelylittleland.Inordertoreducethelandutilization,phasechangematerialswereproposedtouseasbackfillmaterialinsteadofcommonmaterials.ItcandecreaseboreholenumberforthefixedenergydemandUsingPCMisaneffectivemeasuretoreducethesuddenheatingorcoolingwaveuponthegroundandsmooththethermalwavegeneratedfromtheoperationofaGSHP.2.Methods2.1.Modeldomains2.MethodsAsshowninFig.2,itwasclearlyseenthatwhenthegridnumbercontinuestoincreaseabove750,000,thedeviationofresultsbetweenthelastthreemodelswerelessthan1%.ThemodelparametersarelistedinTable1indetails.2.Methods2.2.MathematicalmodelsTheliquidfraction
β,canbedefinedasleft.Liquidfractionisanotherparametertodescribephasechangerate.2.Methods2.3.ModelvalidationAsshowninFig.3,thetemperaturevariationtrendofr1,r2,r3withtimewasinagoodagreementwiththemeasuredvalues.Therefore,itcouldbedemonstratedthatthepresentsimulationmodelwassufficientlyaccuratetoanalyzethermalperformanceofgroundheatexchangersusingphasechangematerialsasgrout2.Methods2.4.Evaluationmethodologies2.4.1.Effectiveness2.4.2.Thermaleffectsradius3.ResultsanddiscussionThosePCMbackfillmaterialwereusedindiscontinuousairconditioningsystem,whichwasrunfor10handstopfor14h.TheGSHPoperationhoursareselectedtorepresenttypicalworkingconditionsattheofficebuilding:8am–18pmfromMondaytoFriday.
Thefollowingworkisappliedtothecoolingmode,whichthefluidiswarmerthanthesoilunderthesummercondition.BothofthemarefilledwiththesameflowrateintheU-tube.3.Resultsanddiscussion3.1.EffectsofbackfillmaterialsonthermalperformanceofGSHEFourdifferentmaterialswerechosenasthebackfillmaterialforGHEs.Soilisthecommonbackfillmaterial,andanotherthreematerialsarePCMs,suchasParaffinRT27,Acid
andEnhancedacid.3.ResultsanddiscussionTheheattransferratedropswiththeincreaseoftime.Itisunderstandablebecausethermalfluidinthetubereleasesheattothesoil.Thenthetemperatureofsoilincreasedwiththetime,whilethetemperaturedifferencebetweenthermalfluidandgroutdecreased
withtime.Theeffectivenessdroppedmonotonouslywithtimeinallcasedconsidered.ComparedtheeffectivenessofacidtothatofRT27,thehigherphasechangetemperaturebroughtthehighereffectiveness.3.ResultsanddiscussionLiquidfractionisanotherparametertodescribephasechangerate.OnecanseefromFig.4(c)thattheliquidfractiongrewmonotonouslywithtimeinallcasesconsideredIfcomparedtheliquidfractionofacidwiththatofRT27,thehigher
phasechangetemperaturebroughtthelower
liquidfraction.Moreover,comparedtheliquidfractionofacidwiththatofenhancedacid,thehigherthermalconductiveresultedinthehigherliquidfraction3.Resultsanddiscussion3.ResultsanddiscussionThethermaleffectsradiusofgroundsourceexchangersat1.5mdeepafterrunning10hwaspresentedinTable3.Inspiteoflowthermalconductivities,therearemanyadvantagesofPCM.Obviously,thePCMtemperaturekeepsconsistentinsolidificationandmeltingprocess,whichisbeneficialforstableoperationoftheGSHPsystem.Moreover,temperaturechangeofsurroundingsoilcanbereducedwithPCMsasbackfill.Thus,thespacingofboreholecanbelessened,andlanddemandcanbereducedeffectivelyaswell.Therefore,PCM,tosomeextent,wassuitableforuseasbackfillmaterialintheGSHPsystem.However,heattransferenhancementsmustbeadopted.(λ:0.2-0.5)3.Resultsanddiscussion3.2.EffectsofinitialgroundtemperatureonthermalperformanceofGSHEFig.6illustratestheeffectivenessofPCMsystemsandheattransferrateunderdifferentinitialgroundtemperatureconditions.Moreover,theeffectivenessofPCMsystemsincreasedasinitialgroundtemperaturedecreased,whichisconsistentwiththeheattransferrateinthisprocess.3.ResultsanddiscussionItmeansthattheproportionofliquidincreasedastheinitialtemperatureclosedtothephasechangetemperature.Specifically,theLiquidfractionincrementinthethreeinitialgroundtemperatureincreased
significantlyasinitialgroundtemperaturegrew,andthisincrementgrewovertime.3.ResultsanddiscussionTable4presentsthatthethermaleffectsradiusofgroundsourceexchangersat1.5
mdeepafterrunning10hunderthreeinitialgroundtemperatureconditions.Admittedly,lowerinitialgroundtemperaturecontributedtolargerheattransferrateandhighereffectiveness.Incontrast,theliquidfractionofPCMandthethermaleffectsradiussawanoppositetrend.Thatistosay,theheattransferrateandthethermaleffectsradiusvarytotheoppositedirectionwiththeinitialgroundtemperature.(undetermined)3.Resultsanddiscussion3.3.EffectsofpipespacingonthermalperformanceofGSHEAsFig.8(a)and(b)show,theheattransferrateandtheeffectivenesshavethesimilartrendsduringthese10h.Fig.9(a)and(b)presentthattheheattransferrateandtheeffectivenessincreasedaspipespacingrose.Especially,heattransferrateofthe60mmpipespacingcasedroppedquickerthanthatoftheothertwocases,whichmeansthattheheattransferconditiondeterioratedseriouslyunderthe60mmpipespacingcondition.3.ResultsanddiscussionFromFig.8(c),liquidfractionofPCMwith80mmpipespacingandthatwith60mmpipespacinghavethesimilartrendduringthe10h.However,liquidfractionofPCMwith100mmpipespacingwaslowerthanthosetwo.Thethermaleffectsradiusofgroundsourceexchangersat1.5mdeepafterrunning10hwerepresentedinTable5.Table5showsthatthethermaleffectsradiuswith100mmpipespacingislargestamongthethreecases.3.ResultsanddiscussionFromFig.9(a),thetemperatureofr0isconstant
inthefirstthreehours,andexperiencedadramaticgrowthinthenextsixhours.After10h,itdecreasedduetothestopofthesystem.Itisunderstandablethatthelatentheatplayedadominaterolewhentheacidwasmeltinginthefirstthreehours,andthenthesensibleheatplayedadominaterolewhenthematerialhadmelted.ThisphenomenoncanbeprovedbyFig.9(d)with60mmpipespacingU-tube.Therewasasharpincreaseintemperatureofr=0with80mmpipespacingU-tubeafter8h,asFig,9(b)shows.Itdelayed5hthanthatwith60mmpipespacingUtube,whichisbecausethemeltingtimeofthematerialbetweentwopipesislonger(Fig.9(d)).Incontrast,thetemperatureofr=0with100mmpipespacingU-tubekeptconstant
afterreachingthemelttemperature(seeFig.9(c)).Thematerialbetweenthetwopipesdidnotfullymelt,andtherewassomesolidacidbetweenthem,asshowninFig.9(d)100mm.Consequently,larger
pipespacingledtolargerheattransferrateandhighereffectiveness.Meanwhile,liquidfractionofPCMwith100
mmpipespacingU-tubewaslowerthantheothertwocases.In
contrast,thethermaleffectsradiusislargestamongthethreecases.Thatistosay,theheattransferrateandthethermaleffectsradiuschangeintheoppositedirection3.Resultsanddiscussion3.4.Combinedeffectsofpipespacingandinitialgroundtemperature4.ConclusionsInthepresentstudy,theprocessofmeltingofaPCMgroutinGSHPhasbeenexplorednumerically.TransientnumericalsimulationswereperformedusingANSYSFLUENT15.0software.Tobeginwith,thethermalperformancesoffourbackfillmaterialswereinvestigated.Furthermore,theinitialgroundtemperaturefactorandpipespacingfactorwerestudied,respectively.Finally,thecombinedeffectsofpipespacingfactorandinitialgroundtemperaturefactoronthethermalperformanceofGSHPwereanalyzed.4.ConclusionsThemainconclusionsaresummarizedasfollows:(1)Duetoitssmallthermaleffec
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 《結(jié)構(gòu)施工圖》課件
- 2026-2030中國(guó)立體車(chē)庫(kù)行業(yè)營(yíng)銷(xiāo)走勢(shì)與未來(lái)銷(xiāo)售趨勢(shì)研究報(bào)告
- 甲醇化學(xué)考試題及答案
- 重慶市江津市2026-2027學(xué)年六上數(shù)學(xué)期末經(jīng)典試題含解析
- 上蔡縣2027屆三年級(jí)數(shù)學(xué)第一學(xué)期期末質(zhì)量檢測(cè)模擬試題含解析
- 大專(zhuān)現(xiàn)代漢語(yǔ)考試題及答案
- 四川廣安友誼中學(xué)2026年物理八年級(jí)第一學(xué)期期末教學(xué)質(zhì)量檢測(cè)模擬試題含解析
- 方位訓(xùn)練考試題及答案大全
- 運(yùn)城小學(xué)考試題及答案解析
- 法律常識(shí)考試題及答案
- 2026秋新北師大版三年級(jí)上冊(cè)小學(xué)數(shù)學(xué)教學(xué)計(jì)劃含進(jìn)度表
- 格力集團(tuán)基層員工形薪酬滿(mǎn)意度對(duì)離職意愿的影響研究
- DB35∕T 1894-2020 數(shù)字福建電子政務(wù)項(xiàng)目審查規(guī)范
- 電梯安全管理員責(zé)任制度
- 2026年甘肅省武威市高職單招職業(yè)技能考試題庫(kù)與答案詳解
- (正式版)DB51∕T 1235-2011 《香樟用材林栽培技術(shù)規(guī)程》
- 中國(guó)抗病毒洗衣液臨床效果驗(yàn)證與醫(yī)療渠道拓展戰(zhàn)略報(bào)告
- 區(qū)域供冷供熱行業(yè)分析報(bào)告
- 《廢棄物綠色再利用碳減排量核算技術(shù)規(guī)范》征求意見(jiàn)稿
- 研發(fā)費(fèi)用歸集管理辦法
- 醫(yī)學(xué)檢驗(yàn)質(zhì)量安全管理培訓(xùn)
評(píng)論
0/150
提交評(píng)論